Insert the maximum demand of the facility (kW). This represents the baseline load before battery operation.
Set the desired peak after shaving. The difference between peak and target defines required battery power.
Duration represents how long the battery must sustain peak shaving.
This tool provides preliminary sizing only. Final system design must consider protection, thermal constraints, manufacturer data, and site-specific conditions.